Project Description
Tagish Engineering Ltd. was commissioned to replace an aging lift station located within the hamlet of Galahad. The project included the removal of the original dry well and wet well system and replace it with a new modernized pre-fabricated wet well pumping system. The lift station receives flows from a 250mm gravity main and pumps the effluent through a 100mm force main. The project also include the supply and instal of a new standby natural gas generator was also included into the project scope to power the system during power failures.
Location
Flagstaff County
Sectors
Highlights
New 7.0m deep wet well lift station
Supply of new 38kW Natural Gas Generator