Stettler Downtown Streetscape
PROJECT. Downtown Streetscape
LOCATION. Stettler, AB
OWNER. Town of Stettler
OWNER’S REPRESENTATIVE.
Melissa Robbins C.E.T, Director of
Operational Services
START DATE. Phase 1 - 2010
COMPLETION DATE. Phase 2 - 2012
CONSTRUCTION COST. $800,000
TAGISH’S ROLE. Prime Consultant
PROJECT DESCRIPTION.
Downtown Streetscape and Road Reconstruction, project consists of removing and replacing all of the existing concrete sidewalks, curbs and gutters and paved surfaces. The existing concrete /paving stone sidewalks were replaced with traffic calming with Allen Block planters and benches at ends and midpoints of each block and sidewalk replacements that consist of an elaborate train track design. The results are an aesthetic street that provides pedestrians areas to relax and converse.
CONSTRUCTION HIGHLIGHTS.
-
Remove and Replace Standard Curb and Gutter
-
Remove and Replace Asphaltic Concrete Pavement
-
Supply & Install Railroad Track Concrete Sidewalk
-
Supply & Install Standard Broom Finished Sidewalk
-
Supply & Install Median Concrete Exposed, Agg
-
Supply and Install Allan Block Wall
-
Supply and Install 914mm Tree Grates
-
Supply and Install R-7582 Reliance Bollards
-
Construction Observation and Inspection
SERVICES PROVIDED.
-
Project Scope Definition and Preliminary Design
-
Detailed Engineering Design
-
Tender Preparation
-
Project Management & Contract Administration
-
Overall site design