Benalto Wastewater Facility Upgrade and Expansion

PROJECT. Benalto Wastewater FacilityUpgrade and Expansion

LOCATION.  Benalto, AB

OWNER. Red Deer County

OWNER’S REPRESENTATIVE.

Andy Treu, Environmental Manager

atreu@rdcounty.ca

START DATE.  2010

COMPLETION DATE.  Fall of 2010

CONSTRUCTION COST.  $1,400,000

TAGISH’S ROLE.  Prime Consultant

 

PROJECT DESCRIPTION.

The Hamlet of Benalto was experiencing growth and their current wastewater treatment cells were not large enough to keep up. The lagoon was an old facility and had not seen improvements or upgrades for a long period of time. Tagish Engineering prepared a BCF grant application and was successful in obtaining funding to significantly upgrade the location and allow for growth to over 500 residents.

 

ENGINEERING HIGHLIGHTS.

The Building Canada Fund related projects were large projects with very aggressive timelines. Tagish Engineering was required to work extremely efficiently to ensure the project milestones were achieved throughout conceptual engineering to the commissioning of this facility.

 

Flow calculations of both the existing wastewater volume and also the proposed future developments needed to be estimated to help size the cells appropriately. As the facility was to be expanded several options were analyzed for the upgrade, to ensure best treatment layout, economical design, lowest land impact, and most efficient constructability.

 

The project was a multi discipline project and Tagish was responsible for coordinating and managing all sub-consultants which included land agents, shallow utility coordination, geotechnical engineering and testing, and legal land surveying. Tagish was able to compile a very competent team that worked very well together throughout the project.

 

Tagish had a dedicated construction team to ensure inspections, surveys, material testing, and contract administration was completed. This project was finished within the appropriate timelines and under budget.

 

CONSTRUCTION HIGHLIGHTS.

  • Topsoil Removal (Stripping, Stockpiling and Replacement)     

  • Waste Excavation and Desludging                                              

  • Common Excavation (Berm Construction, and Onsite Stockpile)         

  • Access Road Construction                                        

  • Offsite Hauling and Stockpiling of Road Fill                                

  • Supply and Install Page Wire Fence                                            

  • Supply and Install 300mm PVC Sanitary Mains                       

  • Supply and Install Manholes and Crossover Structure c/w Piping,

  • Supply and Install 100mm Weeping Tile                                     

  • Supply and Install 100mm Perforated PVC Pipe                         

  • Supply and Install 100mm Vent Stacks

  • Supply and Install 60mil Geomembrane Liner   

                                   

SERVICES PROVIDED.

  • Project Scope Definition and Preliminary Design

  • Geotechnical analysis and Site Selection

  • Wastewater Modeling

  • Detailed Engineering Design

  • Tender Preparation

  • Contract Administration

  • Obtaining proper provincial and municipal approvals

  • Performed all preliminary and construction surveys

  • Overseeing 3rd party contractors for

    • Utility Locates

    • Servicing

  • Project Management

  • Construction Observation and Inspection

     

     

     

     

     

     

     

     

     

 

 

 

 

 

 

 